Paver for the Leavers Garden

002-2013-12-11-mxmrfePNs01r4itdv.png

our naming sign for the Leavers Garden was bolted into place today. We put the first coat of stain on our bridge to match the sign and joined the pebble path to the bridge.

003-2013-12-11-mxmrbs0WzC1r4itdv.png

004-2013-12-11-mxmrafnD941r4itdv.png

We are trying a new way making the koru design in the 2013 paver. We had a polystyrene koru pattern made which has been set into the concrete paver. The koru will be chipped out, memorabilia put in place and then use an outdoor grout to finish it off.

011-2013-12-10-mxknigoTO41r4itdv.png

012-2013-12-10-mxkng104m51r4itdv.png

010-2013-12-10-mxknk3Z8Bj1r4itdv.png

009-2013-12-10-mxknl9Ijdz1r4itdv.png

008-2013-12-10-mxknndP1k91r4itdv.png

007-2013-12-10-mxkno9PzfW1r4itdv.png

006-2013-12-10-mxknopUUJ91r4itdv.png

A new path has been made linking the Leavers Garden to the Junior area. The students enjoyed watching our volunteers digging, boxing the path, the concrete being poured from the big concrete truck and the smoothing of the surface. A great experience for them all with many questions being asked.

015-2013-12-10-mxkn6hYUS81r4itdv.png

016-2013-12-10-mxkn3z0kXm1r4itdv.png

014-2013-12-10-mxkn8mxmCt1r4itdv.png

013-2013-12-10-mxkn261seu1r4itdv.png

005 2013 12 10 mxknylMOMd1r4itdv